Haka DecksHaka Decks

What to expect

Six steps from first call to first barbecue.

Most homeowners have never hired a deck builder before, so here's exactly how it runs — including the step that comes a year after we're done.

  1. 01This week

    The call and the walkthrough

    Tell us what you're picturing — a rough idea is plenty. We come walk the yard with you: sun exposure, grade, sightlines, how you actually want to use the space. It's free, it's usually within the week, and you're talking to the people who will build it, not a salesperson.

  2. 02Days, not weeks

    Design and an itemized number

    We design around the site and the budget, then put a real number on it — itemized, in writing, so you can see exactly where every dollar goes and compare it line-for-line against any other bid. No allowances hiding in a lump sum, no pressure clock on the price.

  3. 032–4 weeks

    Permits and HOA, off your plate

    We produce the drawings, pull the permit, file the HOA architectural paperwork, and handle corrections if a reviewer wants something adjusted. You never stand at a counter. We order materials during the wait so the build starts the day approvals land.

  4. 043–10 days on site

    The build

    Footings, framing, decking, railing — with the city's inspections passed at every required stage and the site left clean every evening. Pete walks every project personally, and you'll always know who's in your yard and what happens next.

  5. 05Final day

    Walkthrough and handoff

    We walk the finished deck together, fix anything that isn't perfect, and hand over the paperwork: the closed permit, your registered manufacturer warranties, and our 2-year written workmanship warranty. Then the space is yours.

  6. 06A year on

    The year-later checkback

    This is the step nobody else promises: we come back. Colorado's first winter is the real test of any deck, and if we think anything isn't perfect — a board that moved, a gate that sags — we fix it. We won't quit until you're thrilled; happy is the only finish line.

Timing it

Working backward from summer.

Add the steps up and a typical project runs four to eight weeks door to door — most of it paperwork lead time, not construction. That's why the homeowners on new decks by Memorial Day are the ones who called in winter. If you're aiming at a date, our guide to timing a Colorado deck build maps the calendar, and the cost calculator gets you a planning number before we ever talk.

Ready to Talk About Your Deck?

Tell us what you're thinking — even if it's just a rough idea. We'll come take a look, talk through options, and give you an honest estimate. No pressure, no sales pitch.